Capabilities
Coverage from distribution and MCCs through field instruments, vendor shops, and pre-commissioning, with
reporting tuned for handover. Our inspectors combine field checks with document review so systems meet
intent before they are placed in service: CEC, Standata and other applicable provincial standards, project
requirements, installation and grounding, readiness
for energization and loop checks, plus traceable test records and punch-list support.
Electrical systems
Distribution from source to load: switchgear, MCCs, motor starters, transformers, cabling, terminations,
grounding, and protective devices, cross-checked to single lines and panel schedules so what you see in the
field matches the approved design before live switching.
Instrumentation & control
Field instruments and control hardware verified for mounting, tagging, tubing, cable type, shielding, and
cabinet build quality against loop diagrams and vendor drawings, cutting noise, mis-wires, and loop-check
surprises.
Vendor & shop inspections
On-site at the vendor for hold points, drawing and ITP review, material verification, witnessed factory
acceptance testing (FAT), and final pre-shipment inspection so you avoid costly "ship-and-fix" cycles.
Pre-commissioning & commissioning support
Before breakers close and loops come online, we support mechanical completion and test evidence: deficiency
identification, test completion checks, documentation review, and punch-list reduction so energization
starts from a controlled baseline.
Field evaluation & compliance
Custom or modified assemblies often need field evaluation paths aligned with CEC and CSA expectations. We
document installed equipment versus labeling, wiring, and protection so authorities having jurisdiction and
your QA teams can accept scope with confidence.
Site commissioning
During integrated site commissioning we support safe, sequenced introduction of electrical and I&C
systems: witness of energization steps, loop and interlock checks, SAT and subsystem turnover reviews, and
alignment of test records with the commissioning plan. We help confirm that systems are ready for operations
handover, punch items are closed or risk-ranked, and documentation reflects what was actually proven in the
field.